Personal comfort zones for existing buildings

Cool the people, not the empty room.

MZOCC is a smart add-on for the air-conditioning your building already has. It notices where people are sitting and how warm they feel, then sends air only to those spots instead of the whole room. Less wasted energy, more comfortable people.

Live at Stanford University · Partnering with Distech Controls

Stanford University conference room where MZOCC is installed

The problem

Most buildings pay to cool empty space.

Standard systems cool a whole room or floor at once. If one person needs cooling, every desk around them gets it too, even the empty ones. And the people inside often still feel too hot or too cold.

About half

of a building’s energy goes to heating, cooling and ventilation

40–80%

of office space is empty at any given time

[Add sources for these figures]

The solution

A personal comfort zone for every person in the room.

MZOCC splits each large space into small zones, one around each ceiling air vent, and controls them separately: comfortable air where people are, less air where nobody is.

Person present: cool air on Empty: air eased back
Heat-sensor view from the ceiling showing people as warm spots

01 · Sense

Read the room

Small heat sensors in the ceiling detect how many people are in the room, where they’re sitting and how warm they are, along with the room’s current conditions.

MZOCC
intelligent layer

02 · Predict

Learn and anticipate

Our software learns how each space is used and what people prefer, then works out the right temperature and amount of air for each small zone. It gets smarter over time.

Small motorized vent controller mounted on a round air duct

03 · Act

Deliver air only where it’s needed

Small motors fitted to selected ceiling vents open and close them right away, taking their instructions through your building’s existing control system.

Temperature map of an office: cool green comfort areas around two seated people, warmer orange areas over empty desks
Backed by science: a computer simulation of an office, confirmed by real-world tests. Green shows comfortable air around the two people sitting; orange shows less cooling over the empty desks.

Nothing new for your facilities team to learn. MZOCC works alongside the control system your building already runs, so operators don’t need special training or equipment.

Why MZOCC

Standard systems cool whole rooms. MZOCC cools the spots people actually use.

Feature Standard building controls MZOCC
What it controls A whole room or floor at once Each ceiling vent separately
How it decides A thermostat setting Where people actually are and how warm they feel
Shared spaces Everyone gets the same temperature Balances air between neighboring spots
Air saved Up to about a third About half or more
Installation Often needs costly system upgrades Added to common existing systems in days
See it in your building

Demos

Working in real buildings today.

Stanford University conference room where the MZOCC pilot is installed

Pilot · Stanford University

Live in a Stanford conference room

MZOCC is installed in a Stanford conference room, working with the building’s existing air-conditioning.

~$50K

rebate matching the energy saved, from Stanford’s facilities department, our first paying customer

Partner · Distech Controls

Built to work with leading building controls

We partner with Distech Controls, a building automation company, so MZOCC can plug into the control systems buildings already use.

[Add details of the Distech Controls demo: where it ran, what was shown and the outcome]

Pilots lined up for three more buildings in the Bay Area.

Publications & media

Peer-reviewed, published and presented.

MZOCC is the result of years of research: 7 journal articles and 11 conference papers, including 6 with ASHRAE, the leading professional body for heating and air-conditioning.

Journal articles

ASHRAE

6 papers · Transactions and conferences

See all publications on Google Scholar →

Early adopter pilot program

Is your building a fit?

MZOCC works in commercial buildings with central air-conditioning. If your building has the items below, it’s likely a strong fit for a pilot. Not sure? Your facilities manager will know, or we can help you check.

  • Central air-conditioningVapor-compression HVAC
  • Ceiling air vents that adjust how much air flowsVAV overhead diffusers
  • Variable-speed fansVFD fans
  • A central building control systemBMS, ideally Niagara-based

What a pilot involves

1

Fit check

We look at your floor plans and air-conditioning setup to choose which vents to upgrade.

2

Quick, low-disruption install

We fit small motors and controllers to selected vents, typically within a few days. Your building keeps running as normal.

3

We handle the rest

Our team installs and monitors everything during the pilot, then reports back on the energy saved and how comfortable people were.

Apply for a pilot

Meet the team

The people behind MZOCC.

MZOCC grew out of years of university research, published in 18 peer-reviewed papers and protected by two provisional international patents.

Tim Trox

Tim Trox

Technical Lead

Stanford University

Nate Denny

Nate Denny

Intern

Stanford University

LinkedIn

Advisors

Albert Chan

Albert Chan

Stanford · MIT · Apple · Meta

LinkedIn
Peter Rumsey

Peter Rumsey

Point Energy Innovations

LinkedIn
Debapratim Pandit

Debapratim Pandit

IIT Kharagpur

LinkedIn

Also advised by Rishee Jain and Arun Majumdar (Stanford University), Prasad Vaidya (IIHS), Satish Kumar (AEEE) and Joy Sen (IIT Kharagpur).

Book a demo

See what MZOCC could save in your building.

Tell us about your space. We’ll walk you through the technology, the Stanford results, and what a pilot would look like for you.

What happens next

01

We review your request within [2 business days].

02

We check your building’s HVAC fit.

03

You get a demo tailored to your spaces.